CBM DecoratorsCornwall
Menu

Porthleven · TR13 · Cornwall

Porthleven painters and decorators, for the harbour trade and the walls that face the weather

Porthleven is the harbour village south-west of Helston, a working port with a clock tower on the quay and as direct a south-westerly exposure as anywhere we cover. Much of what a painter and decorator in Porthleven is asked to do is for the restaurants, cafes and pubs round the harbour.

A January refit and a June touch-up are different jobs

The harbour has become a place people drive to for a meal, and the old lofts, stores and cottages along the quays are now restaurants, cafes, pubs, galleries and shops. Almost none of them can shut for a week in season, so the decorating fits round trading, which here means two quite different kinds of work depending on the month.

Between November and February, once the Christmas trade is done, a restaurant can close for a few days and have the job done properly: the dining room stripped back and repainted, the ceiling above the bar cleaned and coated, the kitchen and back of house done in something that stands up to washing down, and the woodwork rubbed back and rebuilt rather than given one more coat over chips. That is the refit, and it is worth booking early, because every business on the harbour wants the same few quiet weeks.

From Easter to October it is a different conversation. A scuffed wall by the pass, a marked corridor, a window frame that has flaked over the winter: those are done in the hours the place is closed, early mornings or after service, one area at a time, masked off and cleaned up so the first customer of the day would not know we had been there. We agree the pattern before quoting, because out-of-hours work changes how long a job takes.

The painted timber shopfronts and signage boards are their own problem. Timber facing the harbour takes salt and wet all winter and full sun in summer, and a fascia that is not taken back to sound paint, primed on bare wood and rebuilt in full coats will peel at the joints within a couple of years. Hand-painted lettering is masked and left clean; if a sign needs redoing we say so, because that is a signwriter's job rather than ours.

The storm side, and why some fronts are repainted every couple of years

Porthleven faces straight into the south-westerlies with nothing between it and the open Atlantic. In a big winter storm the sea breaks clean over the harbour wall and the timber baulks go in to close the inner harbour; the photographs of waves against the clock tower are famous for a reason. Every house on the seaward slopes gets some of that: spray carried well up the hill, rain driven sideways into render and window joints, and wind that finds any coating not properly stuck down.

That is why a front elevation here can look tired two winters after it was painted while the back of the same house is fine. It is not always the paint. More often it is what went on before it. Render that was not washed down still has salt under the new film, and salt pulls moisture through and lifts the paint from behind. Chalky old paint that was not stabilised gives the new coat nothing to hold onto. Cracks painted over rather than cut out and filled let water in behind the finish, and the first storm pushes it off in sheets.

The way to make a storm-side wall cheaper over time is to spend the money on preparation once. Wash it down and let it dry, repair the blown areas, stabilise the surface, seal the cracks and the joints round windows, prime bare timber, then put the coats on in settled weather so they cure before the next front comes through. A wall done that way still gets hit harder than one in Helston, but the repaint cycle stretches out and the next job is a wash and a coat rather than a strip-back. We look at every elevation before quoting and say which need the full treatment and which only need a wash.

Holiday lets and the cottages up the hill

A large share of the granite cottages and terraces round the harbour and up the hills either side are holiday lets or second homes, and their owners are often not in Cornwall. The pattern is the same as in the other letting villages we cover: the keyholder or agent lets us in, the quote goes by email and sets out what it covers, the work is dated from the booking calendar, and photographs come back when each room is done. Inside, these are old solid walls and low ceilings, so the plaster is filled with something that moves, beams primed so the tannin does not bleed through the white, and the woodwork given a finish that takes a season of cases and sandy feet. That work fits the winter gap. The outside, for a different reason, mostly should not.

Book the outside for after the storms, not before

The instinct in a letting village is to have the outside painted in the autumn so the house looks right for the next season. On this coast that is the wrong way round. A front coated in October faces a whole winter of salt and driven rain before a single guest sees it, and the worst storms usually come between December and February. Better to let the winter do its damage, look at the wall in March once things have settled, and paint in late spring when the surfaces have had a run of dry days and the coats can cure. The paint then has the calm half of the year to harden before it has to earn its keep. Get in touch over the winter and we will book the walk round for after the storms have passed.

Questions from Porthleven

Our restaurant on the harbour cannot close in summer. Can you still decorate it?
Yes, in the hours you are shut. Early mornings before deliveries or after the last service, one area at a time, masked off and cleaned down so you open as normal. A full redecoration of the dining room is better kept for the quiet weeks after Christmas when you can close for a few days, and we would rather say that than squeeze a big job into gaps it does not fit.
The front of our house faces the sea and was painted two years ago. Why is it peeling already?
On the storm side of Porthleven that usually means the wall was not prepared properly rather than that the paint was poor: salt left under the coating, chalky old paint not stabilised, or cracks painted over. We look at what is failing and where, and if the coating underneath is unsound the honest answer is to take it back and start from a clean, dry wall rather than put another coat over it.
We let our cottage and are rarely there. When should the outside be done?
Late spring, once the winter storms have passed and the walls have had dry weather. We can look at it through your keyholder in March, tell you whether it needs paint or just a wash-down that year, and fit the work between bookings before the summer. Painting in autumn on this coast puts fresh paint through the worst of the weather before anyone sees it.

Nearby

Call 07398 190147WhatsApp (opens in a new tab)